MOSSLEY RECREATION GROUNDS REFURBISHMENT
WDR & RT Taggart carried out the role of Lead Consultant on behalf of Newtownabbey Borough Council for the £550k refurbishment of Mossley Recreation Grounds. Works included:
- Floodlighting to training pitch and courts.
- Bitumen macadam engineered bases to pitch and courts.
- Extensive drainage system to all pitches.
- Installation of a 12mm thick permeable textured rubberised polymeric surface suitable for soccer, tennis and basketball.
- Rebound fencing 3.0m high and ballstop fencing 3.5m high.
- 1.5m high demarcation fencing and leaning rail around the Intermediate League pitch.
- Landscaping and landscaped walks.
300m² extension to existing pavilion and refurbishment of remainder with extensive incorporation of sustainable technologies.